Tim

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.

Ive

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.
Back
Next

PHILOSOPHY OF TURNAROUND




  • To do some critical work scope : Statuary compliance, repair / Replacement , Modification / Revamp, Inspection, Maintenance, etc
  • Only on the off-line plant condition (facility shutdown)
  • Only on defined certain period (limited period)
  • Plant in good / higher reliability when back on line

PROJECT


1.     Usually well-defined scope, from:
        1. drawings
        2. specifications
        3. contracts
        4. permits, memos, etc.
2.     Scope is static. Few changes occur during execution.
3.     Can be planned and scheduled well in advance of the project.
4.     Projects are organized around cost codes / commodities.
5.     Generally do not require safety permits to perform work.
6.     Manpower staffing requirements usually do not change during project execution.
7.     Project schedules can be updated either weekly or monthly.
8.     Projects measure time in days, weeks and months.
9.     Project scope is usually all mandatory.
10.   Project schedules are uncompressed. Schedule acceleration can be used to correct slippages in the critical path.

TURNAROUND



1.     Usually loosely defined scope, from:
        1. past turnaround experience
        2. inspection reports
        3. operations requests
        4. historical estimates
2.     Scope is dynamic. Many changes occur as inspections are made.
3.     Planning and scheduling cannot be finalized until the scope is approved, generally near the shutdown date.
4.     Turnarounds are work order based.
5.     Turnaround work requires extensive permitting every shift.
6.     Manpower staffing requirements change during execution due to scope fluctuations (from discovery work).
7.     Turnaround schedules must be updated every shift, daily.
8.     Turnarounds measure time in hours or shifts.
9.     Turnaround scope is flexible. Usually a large percentage of work can be postponed to a later window of opportunity if necessary.
10.     Turnaround schedules are compressed. There may be little or no opportunity to correct the critical path by accelerating the schedule.

TURNAROUND PHASES - BUSINESS PROCESS




GOALS


  • Safe execution
  • Cost effective
  • Quality/product as per committed scope
  • Schedule targets
  • No surprise
  • No rework
  • Business reputation





Our Services
 

Turnaround Construction
Management

To do some critical work scope : Statuary compliance, repair / Replacement , Modification / Revamp, Inspection, Maintenance, etc

In Site Machining

Our  service capabilities range from the smallest plant maintenance service to large-scale turnkey package & manufactured to intl standards

Flange Facing

Whenever you need to re-face gasket seat in-situ, you can rely on our Flange Facing Services. Whether it is a flange
...

Milling

Our milling machines are compact, lightweight, easy to handle, designed sturdy for on site milling app & able to perform
..

Pipe Cutting

Our Pipe Cutting Machine has a robust design but is lightweight and it offers minimal clearance requirements
...

Grinding & Polishing

TSI provide a quick and cost effective methode for the insitu renewal of the surface finished of large diameter steel
...

Flange Management

TSI understand industry’s requirements and provides a complete, high quality  bolting services from design to final tightening and measurements.

Hot Tapping

Titian Services International offer the delivery of safe, effective hot taps and line stops using the latest technologyies.  Fittings and services are available for all types

Welding Habitat System

The WICH System is designed based on flexibility in mind, which helps facilitate hot work better. It comes in versatile designs, various sizes

Hydrotesting & Pneumatic Test

Leak testing may be performed on any process pipework or system to prove the integrity of all flanged joints, welding joints, fittings

Bundle / Flange Puller

Flange puller services are used to exctract flanges tube bundles prior to commencing with cleaning operations or replacing the tubes with the new ones

Chemical Cleaning

The chemical cleaning is performed  in many industries in the commissioning of new plant facilities and during operational turnarounds  of existing plants

Hot Oil Flushing

Flushing is a process which is done  to clear any contaminants present in the pipe and oil after installation. The sole purpose of this process is to avoid damage

Nitrogen And Helium
Services

Uncontrolled emissions, loss of containment, release of hazardous petrochemicals are a direct danger to Health, ...

Retrojetting

we have a large number of highly trained personnel who are specialised in delivering complex water jetting services to the onshore industrial market

Leak Sealing & Repair

Titian Services International (TSI) provides nondestructive, online, on streem leak repair services for process, team, water and air leaks.
PT. Titian Service International
Ruko Allogio Barat no 2 Kawasan Scientia Summarecon Serpong,
Kel. Medang, Kec. Pagedangan, Tangerang, Banten 15334
Telp. 021-55683521 Email: marketing@titianservices.com
   
Copyright © JKstyle 2018. All right reserved.